Stepwise AIC - Does there exist controversy surrounding this topic?











up vote
15
down vote

favorite
6












I've read countless posts on this site that are incredibly against the use of stepwise selection of variables using any sort of criterion whether it be p-values based, AIC, BIC, etc.



I understand why these procedures are in general, quite poor for the selection of variables. gung's probably famous post here clearly illustrates why; ultimately we are verifying a hypothesis on the same dataset we used to come up with the hypothesis, which is just data dredging. Furthermore, p-values are affected by quantities such as collinearity and outliers, which heavily skew results, etc.



However, I've been studying time series forecasting quite a bit lately and have come across Hyndman's well respected textbook in which he mentions here the use of stepwise selection to find the optimal order of ARIMA models in particular. In fact, in the forecast package in R the well known algorithm known as auto.arima by default uses stepwise selection (with AIC, not p-values). He also criticizes p-value based feature selection which aligns well with multiple posts on this website.



Ultimately, we should always cross validate in some way at the end if the goal is to develop good models for forecasting/prediction. However, surely this is somewhat of a disagreement here when it comes to the procedure itself for evaluation metrics other than p-values.



Does anyone have any opinions on the use of stepwise AIC in this context, but also in general out of this context? I have been taught to believe any stepwise selection is poor, but to be honest, auto.arima(stepwise = TRUE) has been giving me better out of sample results than auto.arima(stepwise = FALSE) but perhaps this is just coincidence.










share|cite|improve this question
























  • One of the few things that forecasters can agree on is that selecting one "best" model usually works less well than combining multiple different models.
    – Stephan Kolassa
    Nov 18 at 15:28















up vote
15
down vote

favorite
6












I've read countless posts on this site that are incredibly against the use of stepwise selection of variables using any sort of criterion whether it be p-values based, AIC, BIC, etc.



I understand why these procedures are in general, quite poor for the selection of variables. gung's probably famous post here clearly illustrates why; ultimately we are verifying a hypothesis on the same dataset we used to come up with the hypothesis, which is just data dredging. Furthermore, p-values are affected by quantities such as collinearity and outliers, which heavily skew results, etc.



However, I've been studying time series forecasting quite a bit lately and have come across Hyndman's well respected textbook in which he mentions here the use of stepwise selection to find the optimal order of ARIMA models in particular. In fact, in the forecast package in R the well known algorithm known as auto.arima by default uses stepwise selection (with AIC, not p-values). He also criticizes p-value based feature selection which aligns well with multiple posts on this website.



Ultimately, we should always cross validate in some way at the end if the goal is to develop good models for forecasting/prediction. However, surely this is somewhat of a disagreement here when it comes to the procedure itself for evaluation metrics other than p-values.



Does anyone have any opinions on the use of stepwise AIC in this context, but also in general out of this context? I have been taught to believe any stepwise selection is poor, but to be honest, auto.arima(stepwise = TRUE) has been giving me better out of sample results than auto.arima(stepwise = FALSE) but perhaps this is just coincidence.










share|cite|improve this question
























  • One of the few things that forecasters can agree on is that selecting one "best" model usually works less well than combining multiple different models.
    – Stephan Kolassa
    Nov 18 at 15:28













up vote
15
down vote

favorite
6









up vote
15
down vote

favorite
6






6





I've read countless posts on this site that are incredibly against the use of stepwise selection of variables using any sort of criterion whether it be p-values based, AIC, BIC, etc.



I understand why these procedures are in general, quite poor for the selection of variables. gung's probably famous post here clearly illustrates why; ultimately we are verifying a hypothesis on the same dataset we used to come up with the hypothesis, which is just data dredging. Furthermore, p-values are affected by quantities such as collinearity and outliers, which heavily skew results, etc.



However, I've been studying time series forecasting quite a bit lately and have come across Hyndman's well respected textbook in which he mentions here the use of stepwise selection to find the optimal order of ARIMA models in particular. In fact, in the forecast package in R the well known algorithm known as auto.arima by default uses stepwise selection (with AIC, not p-values). He also criticizes p-value based feature selection which aligns well with multiple posts on this website.



Ultimately, we should always cross validate in some way at the end if the goal is to develop good models for forecasting/prediction. However, surely this is somewhat of a disagreement here when it comes to the procedure itself for evaluation metrics other than p-values.



Does anyone have any opinions on the use of stepwise AIC in this context, but also in general out of this context? I have been taught to believe any stepwise selection is poor, but to be honest, auto.arima(stepwise = TRUE) has been giving me better out of sample results than auto.arima(stepwise = FALSE) but perhaps this is just coincidence.










share|cite|improve this question















I've read countless posts on this site that are incredibly against the use of stepwise selection of variables using any sort of criterion whether it be p-values based, AIC, BIC, etc.



I understand why these procedures are in general, quite poor for the selection of variables. gung's probably famous post here clearly illustrates why; ultimately we are verifying a hypothesis on the same dataset we used to come up with the hypothesis, which is just data dredging. Furthermore, p-values are affected by quantities such as collinearity and outliers, which heavily skew results, etc.



However, I've been studying time series forecasting quite a bit lately and have come across Hyndman's well respected textbook in which he mentions here the use of stepwise selection to find the optimal order of ARIMA models in particular. In fact, in the forecast package in R the well known algorithm known as auto.arima by default uses stepwise selection (with AIC, not p-values). He also criticizes p-value based feature selection which aligns well with multiple posts on this website.



Ultimately, we should always cross validate in some way at the end if the goal is to develop good models for forecasting/prediction. However, surely this is somewhat of a disagreement here when it comes to the procedure itself for evaluation metrics other than p-values.



Does anyone have any opinions on the use of stepwise AIC in this context, but also in general out of this context? I have been taught to believe any stepwise selection is poor, but to be honest, auto.arima(stepwise = TRUE) has been giving me better out of sample results than auto.arima(stepwise = FALSE) but perhaps this is just coincidence.







forecasting predictive-models arima aic stepwise-regression






share|cite|improve this question















share|cite|improve this question













share|cite|improve this question




share|cite|improve this question








edited Nov 18 at 15:53

























asked Nov 17 at 18:07









aranglol

1938




1938












  • One of the few things that forecasters can agree on is that selecting one "best" model usually works less well than combining multiple different models.
    – Stephan Kolassa
    Nov 18 at 15:28


















  • One of the few things that forecasters can agree on is that selecting one "best" model usually works less well than combining multiple different models.
    – Stephan Kolassa
    Nov 18 at 15:28
















One of the few things that forecasters can agree on is that selecting one "best" model usually works less well than combining multiple different models.
– Stephan Kolassa
Nov 18 at 15:28




One of the few things that forecasters can agree on is that selecting one "best" model usually works less well than combining multiple different models.
– Stephan Kolassa
Nov 18 at 15:28










1 Answer
1






active

oldest

votes

















up vote
16
down vote



accepted










There are a few different issues here.




  • Probably the main issue is that model selection (whether using p-values or AICs, stepwise or all-subsets or something else) is primarily problematic for inference (e.g. getting p-values with appropriate type I error, confidence intervals with appropriate coverage). For prediction, model selection can indeed pick a better spot on the bias-variance tradeoff axis and improve out-of-sample error.

  • For some classes of models, AIC is asymptotically equivalent to leave-one-out CV error [see e.g. http://www.petrkeil.com/?p=836 ], so using AIC as a computationally efficient proxy for CV is reasonable.

  • Stepwise selection is often dominated by other model selection (or averaging) methods (all-subsets if computationally feasible, or shrinkage methods). But it's simple and easy to implement, and if the answer is clear enough (some parameters corresponding to strong signals, others weak, few intermediate), then it will give reasonable results. Again, there's a big difference between inference and prediction. For example if you have a couple of strongly correlated predictors, picking the incorrect one (from a "truth"/causal point of view) is a big problem for inference, but picking the one that happens to give you the best AIC is a reasonable strategy for prediction (albeit one that will fail if you try to forecast a situation where the correlation of the predictors changes ...)


Bottom line: for moderately sized data with a reasonable signal-to-noise ratio, AIC-based stepwise selection can indeed produce a defensible predictive model; see Murtaugh (2009) for an example.



Murtaugh, Paul A. "Performance of several variable‐selection methods applied to real ecological data." Ecology letters 12, no. 10 (2009): 1061-1068.






share|cite|improve this answer























  • (+1) Very informative. The approach using AIC/BIC or other information criteria shouldn't be mixed with inferential statistics using $p$-values in any case according to Burnham & Anderson's book "Model selection and multimodel inference: A practical information-theoretic approach."
    – COOLSerdash
    Nov 17 at 20:04












  • Please don't get me started on Burnham and Anderson. github.com/bbolker/discretization
    – Ben Bolker
    Nov 17 at 20:05











Your Answer





StackExchange.ifUsing("editor", function () {
return StackExchange.using("mathjaxEditing", function () {
StackExchange.MarkdownEditor.creationCallbacks.add(function (editor, postfix) {
StackExchange.mathjaxEditing.prepareWmdForMathJax(editor, postfix, [["$", "$"], ["\\(","\\)"]]);
});
});
}, "mathjax-editing");

StackExchange.ready(function() {
var channelOptions = {
tags: "".split(" "),
id: "65"
};
initTagRenderer("".split(" "), "".split(" "), channelOptions);

StackExchange.using("externalEditor", function() {
// Have to fire editor after snippets, if snippets enabled
if (StackExchange.settings.snippets.snippetsEnabled) {
StackExchange.using("snippets", function() {
createEditor();
});
}
else {
createEditor();
}
});

function createEditor() {
StackExchange.prepareEditor({
heartbeatType: 'answer',
convertImagesToLinks: false,
noModals: true,
showLowRepImageUploadWarning: true,
reputationToPostImages: null,
bindNavPrevention: true,
postfix: "",
imageUploader: {
brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
allowUrls: true
},
onDemand: true,
discardSelector: ".discard-answer"
,immediatelyShowMarkdownHelp:true
});


}
});














draft saved

draft discarded


















StackExchange.ready(
function () {
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fstats.stackexchange.com%2fquestions%2f377527%2fstepwise-aic-does-there-exist-controversy-surrounding-this-topic%23new-answer', 'question_page');
}
);

Post as a guest















Required, but never shown

























1 Answer
1






active

oldest

votes








1 Answer
1






active

oldest

votes









active

oldest

votes






active

oldest

votes








up vote
16
down vote



accepted










There are a few different issues here.




  • Probably the main issue is that model selection (whether using p-values or AICs, stepwise or all-subsets or something else) is primarily problematic for inference (e.g. getting p-values with appropriate type I error, confidence intervals with appropriate coverage). For prediction, model selection can indeed pick a better spot on the bias-variance tradeoff axis and improve out-of-sample error.

  • For some classes of models, AIC is asymptotically equivalent to leave-one-out CV error [see e.g. http://www.petrkeil.com/?p=836 ], so using AIC as a computationally efficient proxy for CV is reasonable.

  • Stepwise selection is often dominated by other model selection (or averaging) methods (all-subsets if computationally feasible, or shrinkage methods). But it's simple and easy to implement, and if the answer is clear enough (some parameters corresponding to strong signals, others weak, few intermediate), then it will give reasonable results. Again, there's a big difference between inference and prediction. For example if you have a couple of strongly correlated predictors, picking the incorrect one (from a "truth"/causal point of view) is a big problem for inference, but picking the one that happens to give you the best AIC is a reasonable strategy for prediction (albeit one that will fail if you try to forecast a situation where the correlation of the predictors changes ...)


Bottom line: for moderately sized data with a reasonable signal-to-noise ratio, AIC-based stepwise selection can indeed produce a defensible predictive model; see Murtaugh (2009) for an example.



Murtaugh, Paul A. "Performance of several variable‐selection methods applied to real ecological data." Ecology letters 12, no. 10 (2009): 1061-1068.






share|cite|improve this answer























  • (+1) Very informative. The approach using AIC/BIC or other information criteria shouldn't be mixed with inferential statistics using $p$-values in any case according to Burnham & Anderson's book "Model selection and multimodel inference: A practical information-theoretic approach."
    – COOLSerdash
    Nov 17 at 20:04












  • Please don't get me started on Burnham and Anderson. github.com/bbolker/discretization
    – Ben Bolker
    Nov 17 at 20:05















up vote
16
down vote



accepted










There are a few different issues here.




  • Probably the main issue is that model selection (whether using p-values or AICs, stepwise or all-subsets or something else) is primarily problematic for inference (e.g. getting p-values with appropriate type I error, confidence intervals with appropriate coverage). For prediction, model selection can indeed pick a better spot on the bias-variance tradeoff axis and improve out-of-sample error.

  • For some classes of models, AIC is asymptotically equivalent to leave-one-out CV error [see e.g. http://www.petrkeil.com/?p=836 ], so using AIC as a computationally efficient proxy for CV is reasonable.

  • Stepwise selection is often dominated by other model selection (or averaging) methods (all-subsets if computationally feasible, or shrinkage methods). But it's simple and easy to implement, and if the answer is clear enough (some parameters corresponding to strong signals, others weak, few intermediate), then it will give reasonable results. Again, there's a big difference between inference and prediction. For example if you have a couple of strongly correlated predictors, picking the incorrect one (from a "truth"/causal point of view) is a big problem for inference, but picking the one that happens to give you the best AIC is a reasonable strategy for prediction (albeit one that will fail if you try to forecast a situation where the correlation of the predictors changes ...)


Bottom line: for moderately sized data with a reasonable signal-to-noise ratio, AIC-based stepwise selection can indeed produce a defensible predictive model; see Murtaugh (2009) for an example.



Murtaugh, Paul A. "Performance of several variable‐selection methods applied to real ecological data." Ecology letters 12, no. 10 (2009): 1061-1068.






share|cite|improve this answer























  • (+1) Very informative. The approach using AIC/BIC or other information criteria shouldn't be mixed with inferential statistics using $p$-values in any case according to Burnham & Anderson's book "Model selection and multimodel inference: A practical information-theoretic approach."
    – COOLSerdash
    Nov 17 at 20:04












  • Please don't get me started on Burnham and Anderson. github.com/bbolker/discretization
    – Ben Bolker
    Nov 17 at 20:05













up vote
16
down vote



accepted







up vote
16
down vote



accepted






There are a few different issues here.




  • Probably the main issue is that model selection (whether using p-values or AICs, stepwise or all-subsets or something else) is primarily problematic for inference (e.g. getting p-values with appropriate type I error, confidence intervals with appropriate coverage). For prediction, model selection can indeed pick a better spot on the bias-variance tradeoff axis and improve out-of-sample error.

  • For some classes of models, AIC is asymptotically equivalent to leave-one-out CV error [see e.g. http://www.petrkeil.com/?p=836 ], so using AIC as a computationally efficient proxy for CV is reasonable.

  • Stepwise selection is often dominated by other model selection (or averaging) methods (all-subsets if computationally feasible, or shrinkage methods). But it's simple and easy to implement, and if the answer is clear enough (some parameters corresponding to strong signals, others weak, few intermediate), then it will give reasonable results. Again, there's a big difference between inference and prediction. For example if you have a couple of strongly correlated predictors, picking the incorrect one (from a "truth"/causal point of view) is a big problem for inference, but picking the one that happens to give you the best AIC is a reasonable strategy for prediction (albeit one that will fail if you try to forecast a situation where the correlation of the predictors changes ...)


Bottom line: for moderately sized data with a reasonable signal-to-noise ratio, AIC-based stepwise selection can indeed produce a defensible predictive model; see Murtaugh (2009) for an example.



Murtaugh, Paul A. "Performance of several variable‐selection methods applied to real ecological data." Ecology letters 12, no. 10 (2009): 1061-1068.






share|cite|improve this answer














There are a few different issues here.




  • Probably the main issue is that model selection (whether using p-values or AICs, stepwise or all-subsets or something else) is primarily problematic for inference (e.g. getting p-values with appropriate type I error, confidence intervals with appropriate coverage). For prediction, model selection can indeed pick a better spot on the bias-variance tradeoff axis and improve out-of-sample error.

  • For some classes of models, AIC is asymptotically equivalent to leave-one-out CV error [see e.g. http://www.petrkeil.com/?p=836 ], so using AIC as a computationally efficient proxy for CV is reasonable.

  • Stepwise selection is often dominated by other model selection (or averaging) methods (all-subsets if computationally feasible, or shrinkage methods). But it's simple and easy to implement, and if the answer is clear enough (some parameters corresponding to strong signals, others weak, few intermediate), then it will give reasonable results. Again, there's a big difference between inference and prediction. For example if you have a couple of strongly correlated predictors, picking the incorrect one (from a "truth"/causal point of view) is a big problem for inference, but picking the one that happens to give you the best AIC is a reasonable strategy for prediction (albeit one that will fail if you try to forecast a situation where the correlation of the predictors changes ...)


Bottom line: for moderately sized data with a reasonable signal-to-noise ratio, AIC-based stepwise selection can indeed produce a defensible predictive model; see Murtaugh (2009) for an example.



Murtaugh, Paul A. "Performance of several variable‐selection methods applied to real ecological data." Ecology letters 12, no. 10 (2009): 1061-1068.







share|cite|improve this answer














share|cite|improve this answer



share|cite|improve this answer








edited Nov 18 at 15:33

























answered Nov 17 at 19:17









Ben Bolker

21.9k15987




21.9k15987












  • (+1) Very informative. The approach using AIC/BIC or other information criteria shouldn't be mixed with inferential statistics using $p$-values in any case according to Burnham & Anderson's book "Model selection and multimodel inference: A practical information-theoretic approach."
    – COOLSerdash
    Nov 17 at 20:04












  • Please don't get me started on Burnham and Anderson. github.com/bbolker/discretization
    – Ben Bolker
    Nov 17 at 20:05


















  • (+1) Very informative. The approach using AIC/BIC or other information criteria shouldn't be mixed with inferential statistics using $p$-values in any case according to Burnham & Anderson's book "Model selection and multimodel inference: A practical information-theoretic approach."
    – COOLSerdash
    Nov 17 at 20:04












  • Please don't get me started on Burnham and Anderson. github.com/bbolker/discretization
    – Ben Bolker
    Nov 17 at 20:05
















(+1) Very informative. The approach using AIC/BIC or other information criteria shouldn't be mixed with inferential statistics using $p$-values in any case according to Burnham & Anderson's book "Model selection and multimodel inference: A practical information-theoretic approach."
– COOLSerdash
Nov 17 at 20:04






(+1) Very informative. The approach using AIC/BIC or other information criteria shouldn't be mixed with inferential statistics using $p$-values in any case according to Burnham & Anderson's book "Model selection and multimodel inference: A practical information-theoretic approach."
– COOLSerdash
Nov 17 at 20:04














Please don't get me started on Burnham and Anderson. github.com/bbolker/discretization
– Ben Bolker
Nov 17 at 20:05




Please don't get me started on Burnham and Anderson. github.com/bbolker/discretization
– Ben Bolker
Nov 17 at 20:05


















draft saved

draft discarded




















































Thanks for contributing an answer to Cross Validated!


  • Please be sure to answer the question. Provide details and share your research!

But avoid



  • Asking for help, clarification, or responding to other answers.

  • Making statements based on opinion; back them up with references or personal experience.


Use MathJax to format equations. MathJax reference.


To learn more, see our tips on writing great answers.





Some of your past answers have not been well-received, and you're in danger of being blocked from answering.


Please pay close attention to the following guidance:


  • Please be sure to answer the question. Provide details and share your research!

But avoid



  • Asking for help, clarification, or responding to other answers.

  • Making statements based on opinion; back them up with references or personal experience.


To learn more, see our tips on writing great answers.




draft saved


draft discarded














StackExchange.ready(
function () {
StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fstats.stackexchange.com%2fquestions%2f377527%2fstepwise-aic-does-there-exist-controversy-surrounding-this-topic%23new-answer', 'question_page');
}
);

Post as a guest















Required, but never shown





















































Required, but never shown














Required, but never shown












Required, but never shown







Required, but never shown

































Required, but never shown














Required, but never shown












Required, but never shown







Required, but never shown







Popular posts from this blog

How to change which sound is reproduced for terminal bell?

Can I use Tabulator js library in my java Spring + Thymeleaf project?

Title Spacing in Bjornstrup Chapter, Removing Chapter Number From Contents