Calculating the number of days between two dates in Excel





.everyoneloves__top-leaderboard:empty,.everyoneloves__mid-leaderboard:empty,.everyoneloves__bot-mid-leaderboard:empty{ height:90px;width:728px;box-sizing:border-box;
}







9















I consider 7 days to be a week,
so if I look at 1 January 2019 - 7 January 2019,
I would say that is 7 days. 
But often I seen when people are calculating the number of days between two dates or age they use the formula B1-A1 where A1 is the Start Date/DoB
and B1 is the end date or today's date. 
This would give 6 for the above example.



I use (B1-A1)+1 which gives 7
and for dates of birth I would use ((B1-A1)+1)/365.25
Which is correct?










share|improve this question




















  • 2





    7 - 1 is 6, no? What is correct depends on your definition and whether you include timestamps or not. When subtracting 20190101T00:00:00 from 20190107T23:59:59, you get 6.999, which can be rounded appropriately.

    – slhck
    Mar 25 at 12:38











  • @slhck That really makes sense when you think about the time as well as date.

    – Naz
    Mar 25 at 12:54






  • 7





    If start date/dob and today are the same day, do you want the answer to be 0 or 1? B1-A1 is the number of complete days that have past.

    – Forward Ed
    Mar 25 at 13:28






  • 2





    You're asking whether exclusive or inclusive operations are correct. They're both correct, depending on what you are trying to achieve. See @Chris Rogers's answer below.

    – studog
    Mar 25 at 18:56











  • (1) Well, there’s also the point of view that there are 5 days between 1 January and 7 January.  See this.  (2) If a person was born on 27 March 1959, on what day did they turn 20?  27 March 1979.  Now, if B1 = 27 March 1979 and A1 = 27 March 1959, what does your formula say?  What does it say for B1 = 26 March 1979?

    – Scott
    Mar 27 at 5:14


















9















I consider 7 days to be a week,
so if I look at 1 January 2019 - 7 January 2019,
I would say that is 7 days. 
But often I seen when people are calculating the number of days between two dates or age they use the formula B1-A1 where A1 is the Start Date/DoB
and B1 is the end date or today's date. 
This would give 6 for the above example.



I use (B1-A1)+1 which gives 7
and for dates of birth I would use ((B1-A1)+1)/365.25
Which is correct?










share|improve this question




















  • 2





    7 - 1 is 6, no? What is correct depends on your definition and whether you include timestamps or not. When subtracting 20190101T00:00:00 from 20190107T23:59:59, you get 6.999, which can be rounded appropriately.

    – slhck
    Mar 25 at 12:38











  • @slhck That really makes sense when you think about the time as well as date.

    – Naz
    Mar 25 at 12:54






  • 7





    If start date/dob and today are the same day, do you want the answer to be 0 or 1? B1-A1 is the number of complete days that have past.

    – Forward Ed
    Mar 25 at 13:28






  • 2





    You're asking whether exclusive or inclusive operations are correct. They're both correct, depending on what you are trying to achieve. See @Chris Rogers's answer below.

    – studog
    Mar 25 at 18:56











  • (1) Well, there’s also the point of view that there are 5 days between 1 January and 7 January.  See this.  (2) If a person was born on 27 March 1959, on what day did they turn 20?  27 March 1979.  Now, if B1 = 27 March 1979 and A1 = 27 March 1959, what does your formula say?  What does it say for B1 = 26 March 1979?

    – Scott
    Mar 27 at 5:14














9












9








9


2






I consider 7 days to be a week,
so if I look at 1 January 2019 - 7 January 2019,
I would say that is 7 days. 
But often I seen when people are calculating the number of days between two dates or age they use the formula B1-A1 where A1 is the Start Date/DoB
and B1 is the end date or today's date. 
This would give 6 for the above example.



I use (B1-A1)+1 which gives 7
and for dates of birth I would use ((B1-A1)+1)/365.25
Which is correct?










share|improve this question
















I consider 7 days to be a week,
so if I look at 1 January 2019 - 7 January 2019,
I would say that is 7 days. 
But often I seen when people are calculating the number of days between two dates or age they use the formula B1-A1 where A1 is the Start Date/DoB
and B1 is the end date or today's date. 
This would give 6 for the above example.



I use (B1-A1)+1 which gives 7
and for dates of birth I would use ((B1-A1)+1)/365.25
Which is correct?







microsoft-excel date-time date






share|improve this question















share|improve this question













share|improve this question




share|improve this question








edited Mar 27 at 5:10









Scott

16.2k113990




16.2k113990










asked Mar 25 at 12:12









NazNaz

17912




17912








  • 2





    7 - 1 is 6, no? What is correct depends on your definition and whether you include timestamps or not. When subtracting 20190101T00:00:00 from 20190107T23:59:59, you get 6.999, which can be rounded appropriately.

    – slhck
    Mar 25 at 12:38











  • @slhck That really makes sense when you think about the time as well as date.

    – Naz
    Mar 25 at 12:54






  • 7





    If start date/dob and today are the same day, do you want the answer to be 0 or 1? B1-A1 is the number of complete days that have past.

    – Forward Ed
    Mar 25 at 13:28






  • 2





    You're asking whether exclusive or inclusive operations are correct. They're both correct, depending on what you are trying to achieve. See @Chris Rogers's answer below.

    – studog
    Mar 25 at 18:56











  • (1) Well, there’s also the point of view that there are 5 days between 1 January and 7 January.  See this.  (2) If a person was born on 27 March 1959, on what day did they turn 20?  27 March 1979.  Now, if B1 = 27 March 1979 and A1 = 27 March 1959, what does your formula say?  What does it say for B1 = 26 March 1979?

    – Scott
    Mar 27 at 5:14














  • 2





    7 - 1 is 6, no? What is correct depends on your definition and whether you include timestamps or not. When subtracting 20190101T00:00:00 from 20190107T23:59:59, you get 6.999, which can be rounded appropriately.

    – slhck
    Mar 25 at 12:38











  • @slhck That really makes sense when you think about the time as well as date.

    – Naz
    Mar 25 at 12:54






  • 7





    If start date/dob and today are the same day, do you want the answer to be 0 or 1? B1-A1 is the number of complete days that have past.

    – Forward Ed
    Mar 25 at 13:28






  • 2





    You're asking whether exclusive or inclusive operations are correct. They're both correct, depending on what you are trying to achieve. See @Chris Rogers's answer below.

    – studog
    Mar 25 at 18:56











  • (1) Well, there’s also the point of view that there are 5 days between 1 January and 7 January.  See this.  (2) If a person was born on 27 March 1959, on what day did they turn 20?  27 March 1979.  Now, if B1 = 27 March 1979 and A1 = 27 March 1959, what does your formula say?  What does it say for B1 = 26 March 1979?

    – Scott
    Mar 27 at 5:14








2




2





7 - 1 is 6, no? What is correct depends on your definition and whether you include timestamps or not. When subtracting 20190101T00:00:00 from 20190107T23:59:59, you get 6.999, which can be rounded appropriately.

– slhck
Mar 25 at 12:38





7 - 1 is 6, no? What is correct depends on your definition and whether you include timestamps or not. When subtracting 20190101T00:00:00 from 20190107T23:59:59, you get 6.999, which can be rounded appropriately.

– slhck
Mar 25 at 12:38













@slhck That really makes sense when you think about the time as well as date.

– Naz
Mar 25 at 12:54





@slhck That really makes sense when you think about the time as well as date.

– Naz
Mar 25 at 12:54




7




7





If start date/dob and today are the same day, do you want the answer to be 0 or 1? B1-A1 is the number of complete days that have past.

– Forward Ed
Mar 25 at 13:28





If start date/dob and today are the same day, do you want the answer to be 0 or 1? B1-A1 is the number of complete days that have past.

– Forward Ed
Mar 25 at 13:28




2




2





You're asking whether exclusive or inclusive operations are correct. They're both correct, depending on what you are trying to achieve. See @Chris Rogers's answer below.

– studog
Mar 25 at 18:56





You're asking whether exclusive or inclusive operations are correct. They're both correct, depending on what you are trying to achieve. See @Chris Rogers's answer below.

– studog
Mar 25 at 18:56













(1) Well, there’s also the point of view that there are 5 days between 1 January and 7 January.  See this.  (2) If a person was born on 27 March 1959, on what day did they turn 20?  27 March 1979.  Now, if B1 = 27 March 1979 and A1 = 27 March 1959, what does your formula say?  What does it say for B1 = 26 March 1979?

– Scott
Mar 27 at 5:14





(1) Well, there’s also the point of view that there are 5 days between 1 January and 7 January.  See this.  (2) If a person was born on 27 March 1959, on what day did they turn 20?  27 March 1979.  Now, if B1 = 27 March 1979 and A1 = 27 March 1959, what does your formula say?  What does it say for B1 = 26 March 1979?

– Scott
Mar 27 at 5:14










3 Answers
3






active

oldest

votes


















16














It is not a question of one formula being right and the other being wrong. It is a question of what you are looking for.



Say you are working on a task 24 hours a day. You begin the task 17 January 2000 at 9:00 AM and complete the task 18 January 2000 at 9:00 AM. If the question is How many days did the task take ? You would take the difference; get 24 hours and answer 1 day.

If, however, the question is On how many days did you work on the task ? You would immediately respond 2



Thus =B1 - A1 or =B1 - A1 + 1 might be appropriate depending on what you are trying to measure.






share|improve this answer

































    14














    The answer revolves around how Excel deals with dates. When days between dates are calculated using formulae such as B1-A1, Excel would turn the dates into serial numbers and use the serial numbers to calculate the number or days in between.




    By default, January 1, 1900 is serial number 1, and January 1, 2008 is serial number 39448 because it is 39,447 days after January 1, 1900. (Source: Microsoft)




    So the days between January 1, 1900 and January 7, 1900 would equal 7 minus 1 equalling 6.



    The same would apply with 1/1/2008 - 7/1/2008



    January 1, 2008 is 39,447 and
    January 7, 2008 is 39,453



    39,453 — 39,447 = 6



    If you wish to count the days inclusive you would need to add 1 to make the formula to be for example B1-A1+1.



    If you want to calculate days exclusive you would need to minus 1 day making B1-A1-1






    share|improve this answer





















    • 3





      The deeper answer is that mathematical operations like + and - are defined as an exclusive operation. It's not Excel-specific; the Excel part is the translation from date/timestamps to serial numbers.

      – studog
      Mar 25 at 18:50



















    -1














    I wold like to suggest 3 different Formula to Calculate AGE between 2 Dates.



    enter image description here




    1. To get only Years:


    =INT((B1-A1)/365)



    Or,



    =ROUNDDOWN(YEARFRAC(A1, B1, 1), 0)



    Or, you may use TODAY() Function also:



    =ROUNDDOWN(YEARFRAC(A1, TODAY(), 1), 0)





    1. To Get Complete Age in Years, Months and Days use this one.



      =DATEDIF(A1,B1,"Y") & " Years, " & DATEDIF(A1,B1,"YM") & " Months, " & DATEDIF(A1,B1,"MD") & " Days"



    Edited:



    Counting number of days between two Dates is little bit arbitrary. Basically depends on need.




    1. Count number of days, Excluding Start
      Date
      .

    2. Count number of days, Including Start
      Date
      .

    3. Count number of days, Excluding both
      Start & End Date
      .


    enter image description here



    Considering OP's Sample Dates following Formula can be used.



    Formula for situation 1:



    =DATEDIF(B2,B3,"d")



    =DAYS(B3,B2)



    =INT(B3-B2)



    Formula for situation 2:



    =DATEDIF(B2,B3,"d")+1



    =DAYS(B3,B2)+1



    =INT(B3-B2+1)



    Formula for situation 3:



    =DATEDIF(B2,B3,"d")-1



    =DAYS(B3,B2)-1



    =INT(B3-B2-1)



    Adjust Cell references in the Formula as needed.






    share|improve this answer





















    • 3





      This is over complicating things and doesn't answer the question (how many days). The OP is not asking number of years or years, months and days.

      – Chris Rogers
      Mar 25 at 12:55











    • @ChrisRogers,, Read my post I've suggested all possible Formula, including the OP's one, regarding ((B1-A1)+1)/365.25. It's really unfortunate to get DOWN VOTE after All !!

      – Rajesh S
      Mar 25 at 12:58













    • @ChrisRogers,, this is part of OP,,But often I seen when people are calculating the number of days between 2 dates or age they use the formula B1-A1

      – Rajesh S
      Mar 25 at 13:02











    • @ChrisRogers,, considering the Formula OP has written and I've shown in comments ,, my solution has Focused on ALL that and the Suggested one is an improvise version I've shown with my Answer !! =INT((B1-A1)/365)

      – Rajesh S
      Mar 25 at 13:05








    • 3





      INT((B1-A1)/365) can provide the wrong result if there is are leap years involved.

      – Chris Rogers
      Mar 25 at 13:21












    Your Answer








    StackExchange.ready(function() {
    var channelOptions = {
    tags: "".split(" "),
    id: "3"
    };
    initTagRenderer("".split(" "), "".split(" "), channelOptions);

    StackExchange.using("externalEditor", function() {
    // Have to fire editor after snippets, if snippets enabled
    if (StackExchange.settings.snippets.snippetsEnabled) {
    StackExchange.using("snippets", function() {
    createEditor();
    });
    }
    else {
    createEditor();
    }
    });

    function createEditor() {
    StackExchange.prepareEditor({
    heartbeatType: 'answer',
    autoActivateHeartbeat: false,
    convertImagesToLinks: true,
    noModals: true,
    showLowRepImageUploadWarning: true,
    reputationToPostImages: 10,
    bindNavPrevention: true,
    postfix: "",
    imageUploader: {
    brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
    contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
    allowUrls: true
    },
    onDemand: true,
    discardSelector: ".discard-answer"
    ,immediatelyShowMarkdownHelp:true
    });


    }
    });














    draft saved

    draft discarded


















    StackExchange.ready(
    function () {
    StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fsuperuser.com%2fquestions%2f1417263%2fcalculating-the-number-of-days-between-two-dates-in-excel%23new-answer', 'question_page');
    }
    );

    Post as a guest















    Required, but never shown

























    3 Answers
    3






    active

    oldest

    votes








    3 Answers
    3






    active

    oldest

    votes









    active

    oldest

    votes






    active

    oldest

    votes









    16














    It is not a question of one formula being right and the other being wrong. It is a question of what you are looking for.



    Say you are working on a task 24 hours a day. You begin the task 17 January 2000 at 9:00 AM and complete the task 18 January 2000 at 9:00 AM. If the question is How many days did the task take ? You would take the difference; get 24 hours and answer 1 day.

    If, however, the question is On how many days did you work on the task ? You would immediately respond 2



    Thus =B1 - A1 or =B1 - A1 + 1 might be appropriate depending on what you are trying to measure.






    share|improve this answer






























      16














      It is not a question of one formula being right and the other being wrong. It is a question of what you are looking for.



      Say you are working on a task 24 hours a day. You begin the task 17 January 2000 at 9:00 AM and complete the task 18 January 2000 at 9:00 AM. If the question is How many days did the task take ? You would take the difference; get 24 hours and answer 1 day.

      If, however, the question is On how many days did you work on the task ? You would immediately respond 2



      Thus =B1 - A1 or =B1 - A1 + 1 might be appropriate depending on what you are trying to measure.






      share|improve this answer




























        16












        16








        16







        It is not a question of one formula being right and the other being wrong. It is a question of what you are looking for.



        Say you are working on a task 24 hours a day. You begin the task 17 January 2000 at 9:00 AM and complete the task 18 January 2000 at 9:00 AM. If the question is How many days did the task take ? You would take the difference; get 24 hours and answer 1 day.

        If, however, the question is On how many days did you work on the task ? You would immediately respond 2



        Thus =B1 - A1 or =B1 - A1 + 1 might be appropriate depending on what you are trying to measure.






        share|improve this answer















        It is not a question of one formula being right and the other being wrong. It is a question of what you are looking for.



        Say you are working on a task 24 hours a day. You begin the task 17 January 2000 at 9:00 AM and complete the task 18 January 2000 at 9:00 AM. If the question is How many days did the task take ? You would take the difference; get 24 hours and answer 1 day.

        If, however, the question is On how many days did you work on the task ? You would immediately respond 2



        Thus =B1 - A1 or =B1 - A1 + 1 might be appropriate depending on what you are trying to measure.







        share|improve this answer














        share|improve this answer



        share|improve this answer








        edited Mar 26 at 10:38

























        answered Mar 25 at 13:32









        Gary's StudentGary's Student

        14.2k31733




        14.2k31733

























            14














            The answer revolves around how Excel deals with dates. When days between dates are calculated using formulae such as B1-A1, Excel would turn the dates into serial numbers and use the serial numbers to calculate the number or days in between.




            By default, January 1, 1900 is serial number 1, and January 1, 2008 is serial number 39448 because it is 39,447 days after January 1, 1900. (Source: Microsoft)




            So the days between January 1, 1900 and January 7, 1900 would equal 7 minus 1 equalling 6.



            The same would apply with 1/1/2008 - 7/1/2008



            January 1, 2008 is 39,447 and
            January 7, 2008 is 39,453



            39,453 — 39,447 = 6



            If you wish to count the days inclusive you would need to add 1 to make the formula to be for example B1-A1+1.



            If you want to calculate days exclusive you would need to minus 1 day making B1-A1-1






            share|improve this answer





















            • 3





              The deeper answer is that mathematical operations like + and - are defined as an exclusive operation. It's not Excel-specific; the Excel part is the translation from date/timestamps to serial numbers.

              – studog
              Mar 25 at 18:50
















            14














            The answer revolves around how Excel deals with dates. When days between dates are calculated using formulae such as B1-A1, Excel would turn the dates into serial numbers and use the serial numbers to calculate the number or days in between.




            By default, January 1, 1900 is serial number 1, and January 1, 2008 is serial number 39448 because it is 39,447 days after January 1, 1900. (Source: Microsoft)




            So the days between January 1, 1900 and January 7, 1900 would equal 7 minus 1 equalling 6.



            The same would apply with 1/1/2008 - 7/1/2008



            January 1, 2008 is 39,447 and
            January 7, 2008 is 39,453



            39,453 — 39,447 = 6



            If you wish to count the days inclusive you would need to add 1 to make the formula to be for example B1-A1+1.



            If you want to calculate days exclusive you would need to minus 1 day making B1-A1-1






            share|improve this answer





















            • 3





              The deeper answer is that mathematical operations like + and - are defined as an exclusive operation. It's not Excel-specific; the Excel part is the translation from date/timestamps to serial numbers.

              – studog
              Mar 25 at 18:50














            14












            14








            14







            The answer revolves around how Excel deals with dates. When days between dates are calculated using formulae such as B1-A1, Excel would turn the dates into serial numbers and use the serial numbers to calculate the number or days in between.




            By default, January 1, 1900 is serial number 1, and January 1, 2008 is serial number 39448 because it is 39,447 days after January 1, 1900. (Source: Microsoft)




            So the days between January 1, 1900 and January 7, 1900 would equal 7 minus 1 equalling 6.



            The same would apply with 1/1/2008 - 7/1/2008



            January 1, 2008 is 39,447 and
            January 7, 2008 is 39,453



            39,453 — 39,447 = 6



            If you wish to count the days inclusive you would need to add 1 to make the formula to be for example B1-A1+1.



            If you want to calculate days exclusive you would need to minus 1 day making B1-A1-1






            share|improve this answer















            The answer revolves around how Excel deals with dates. When days between dates are calculated using formulae such as B1-A1, Excel would turn the dates into serial numbers and use the serial numbers to calculate the number or days in between.




            By default, January 1, 1900 is serial number 1, and January 1, 2008 is serial number 39448 because it is 39,447 days after January 1, 1900. (Source: Microsoft)




            So the days between January 1, 1900 and January 7, 1900 would equal 7 minus 1 equalling 6.



            The same would apply with 1/1/2008 - 7/1/2008



            January 1, 2008 is 39,447 and
            January 7, 2008 is 39,453



            39,453 — 39,447 = 6



            If you wish to count the days inclusive you would need to add 1 to make the formula to be for example B1-A1+1.



            If you want to calculate days exclusive you would need to minus 1 day making B1-A1-1







            share|improve this answer














            share|improve this answer



            share|improve this answer








            edited Mar 25 at 12:53

























            answered Mar 25 at 12:47









            Chris RogersChris Rogers

            1,019220




            1,019220








            • 3





              The deeper answer is that mathematical operations like + and - are defined as an exclusive operation. It's not Excel-specific; the Excel part is the translation from date/timestamps to serial numbers.

              – studog
              Mar 25 at 18:50














            • 3





              The deeper answer is that mathematical operations like + and - are defined as an exclusive operation. It's not Excel-specific; the Excel part is the translation from date/timestamps to serial numbers.

              – studog
              Mar 25 at 18:50








            3




            3





            The deeper answer is that mathematical operations like + and - are defined as an exclusive operation. It's not Excel-specific; the Excel part is the translation from date/timestamps to serial numbers.

            – studog
            Mar 25 at 18:50





            The deeper answer is that mathematical operations like + and - are defined as an exclusive operation. It's not Excel-specific; the Excel part is the translation from date/timestamps to serial numbers.

            – studog
            Mar 25 at 18:50











            -1














            I wold like to suggest 3 different Formula to Calculate AGE between 2 Dates.



            enter image description here




            1. To get only Years:


            =INT((B1-A1)/365)



            Or,



            =ROUNDDOWN(YEARFRAC(A1, B1, 1), 0)



            Or, you may use TODAY() Function also:



            =ROUNDDOWN(YEARFRAC(A1, TODAY(), 1), 0)





            1. To Get Complete Age in Years, Months and Days use this one.



              =DATEDIF(A1,B1,"Y") & " Years, " & DATEDIF(A1,B1,"YM") & " Months, " & DATEDIF(A1,B1,"MD") & " Days"



            Edited:



            Counting number of days between two Dates is little bit arbitrary. Basically depends on need.




            1. Count number of days, Excluding Start
              Date
              .

            2. Count number of days, Including Start
              Date
              .

            3. Count number of days, Excluding both
              Start & End Date
              .


            enter image description here



            Considering OP's Sample Dates following Formula can be used.



            Formula for situation 1:



            =DATEDIF(B2,B3,"d")



            =DAYS(B3,B2)



            =INT(B3-B2)



            Formula for situation 2:



            =DATEDIF(B2,B3,"d")+1



            =DAYS(B3,B2)+1



            =INT(B3-B2+1)



            Formula for situation 3:



            =DATEDIF(B2,B3,"d")-1



            =DAYS(B3,B2)-1



            =INT(B3-B2-1)



            Adjust Cell references in the Formula as needed.






            share|improve this answer





















            • 3





              This is over complicating things and doesn't answer the question (how many days). The OP is not asking number of years or years, months and days.

              – Chris Rogers
              Mar 25 at 12:55











            • @ChrisRogers,, Read my post I've suggested all possible Formula, including the OP's one, regarding ((B1-A1)+1)/365.25. It's really unfortunate to get DOWN VOTE after All !!

              – Rajesh S
              Mar 25 at 12:58













            • @ChrisRogers,, this is part of OP,,But often I seen when people are calculating the number of days between 2 dates or age they use the formula B1-A1

              – Rajesh S
              Mar 25 at 13:02











            • @ChrisRogers,, considering the Formula OP has written and I've shown in comments ,, my solution has Focused on ALL that and the Suggested one is an improvise version I've shown with my Answer !! =INT((B1-A1)/365)

              – Rajesh S
              Mar 25 at 13:05








            • 3





              INT((B1-A1)/365) can provide the wrong result if there is are leap years involved.

              – Chris Rogers
              Mar 25 at 13:21
















            -1














            I wold like to suggest 3 different Formula to Calculate AGE between 2 Dates.



            enter image description here




            1. To get only Years:


            =INT((B1-A1)/365)



            Or,



            =ROUNDDOWN(YEARFRAC(A1, B1, 1), 0)



            Or, you may use TODAY() Function also:



            =ROUNDDOWN(YEARFRAC(A1, TODAY(), 1), 0)





            1. To Get Complete Age in Years, Months and Days use this one.



              =DATEDIF(A1,B1,"Y") & " Years, " & DATEDIF(A1,B1,"YM") & " Months, " & DATEDIF(A1,B1,"MD") & " Days"



            Edited:



            Counting number of days between two Dates is little bit arbitrary. Basically depends on need.




            1. Count number of days, Excluding Start
              Date
              .

            2. Count number of days, Including Start
              Date
              .

            3. Count number of days, Excluding both
              Start & End Date
              .


            enter image description here



            Considering OP's Sample Dates following Formula can be used.



            Formula for situation 1:



            =DATEDIF(B2,B3,"d")



            =DAYS(B3,B2)



            =INT(B3-B2)



            Formula for situation 2:



            =DATEDIF(B2,B3,"d")+1



            =DAYS(B3,B2)+1



            =INT(B3-B2+1)



            Formula for situation 3:



            =DATEDIF(B2,B3,"d")-1



            =DAYS(B3,B2)-1



            =INT(B3-B2-1)



            Adjust Cell references in the Formula as needed.






            share|improve this answer





















            • 3





              This is over complicating things and doesn't answer the question (how many days). The OP is not asking number of years or years, months and days.

              – Chris Rogers
              Mar 25 at 12:55











            • @ChrisRogers,, Read my post I've suggested all possible Formula, including the OP's one, regarding ((B1-A1)+1)/365.25. It's really unfortunate to get DOWN VOTE after All !!

              – Rajesh S
              Mar 25 at 12:58













            • @ChrisRogers,, this is part of OP,,But often I seen when people are calculating the number of days between 2 dates or age they use the formula B1-A1

              – Rajesh S
              Mar 25 at 13:02











            • @ChrisRogers,, considering the Formula OP has written and I've shown in comments ,, my solution has Focused on ALL that and the Suggested one is an improvise version I've shown with my Answer !! =INT((B1-A1)/365)

              – Rajesh S
              Mar 25 at 13:05








            • 3





              INT((B1-A1)/365) can provide the wrong result if there is are leap years involved.

              – Chris Rogers
              Mar 25 at 13:21














            -1












            -1








            -1







            I wold like to suggest 3 different Formula to Calculate AGE between 2 Dates.



            enter image description here




            1. To get only Years:


            =INT((B1-A1)/365)



            Or,



            =ROUNDDOWN(YEARFRAC(A1, B1, 1), 0)



            Or, you may use TODAY() Function also:



            =ROUNDDOWN(YEARFRAC(A1, TODAY(), 1), 0)





            1. To Get Complete Age in Years, Months and Days use this one.



              =DATEDIF(A1,B1,"Y") & " Years, " & DATEDIF(A1,B1,"YM") & " Months, " & DATEDIF(A1,B1,"MD") & " Days"



            Edited:



            Counting number of days between two Dates is little bit arbitrary. Basically depends on need.




            1. Count number of days, Excluding Start
              Date
              .

            2. Count number of days, Including Start
              Date
              .

            3. Count number of days, Excluding both
              Start & End Date
              .


            enter image description here



            Considering OP's Sample Dates following Formula can be used.



            Formula for situation 1:



            =DATEDIF(B2,B3,"d")



            =DAYS(B3,B2)



            =INT(B3-B2)



            Formula for situation 2:



            =DATEDIF(B2,B3,"d")+1



            =DAYS(B3,B2)+1



            =INT(B3-B2+1)



            Formula for situation 3:



            =DATEDIF(B2,B3,"d")-1



            =DAYS(B3,B2)-1



            =INT(B3-B2-1)



            Adjust Cell references in the Formula as needed.






            share|improve this answer















            I wold like to suggest 3 different Formula to Calculate AGE between 2 Dates.



            enter image description here




            1. To get only Years:


            =INT((B1-A1)/365)



            Or,



            =ROUNDDOWN(YEARFRAC(A1, B1, 1), 0)



            Or, you may use TODAY() Function also:



            =ROUNDDOWN(YEARFRAC(A1, TODAY(), 1), 0)





            1. To Get Complete Age in Years, Months and Days use this one.



              =DATEDIF(A1,B1,"Y") & " Years, " & DATEDIF(A1,B1,"YM") & " Months, " & DATEDIF(A1,B1,"MD") & " Days"



            Edited:



            Counting number of days between two Dates is little bit arbitrary. Basically depends on need.




            1. Count number of days, Excluding Start
              Date
              .

            2. Count number of days, Including Start
              Date
              .

            3. Count number of days, Excluding both
              Start & End Date
              .


            enter image description here



            Considering OP's Sample Dates following Formula can be used.



            Formula for situation 1:



            =DATEDIF(B2,B3,"d")



            =DAYS(B3,B2)



            =INT(B3-B2)



            Formula for situation 2:



            =DATEDIF(B2,B3,"d")+1



            =DAYS(B3,B2)+1



            =INT(B3-B2+1)



            Formula for situation 3:



            =DATEDIF(B2,B3,"d")-1



            =DAYS(B3,B2)-1



            =INT(B3-B2-1)



            Adjust Cell references in the Formula as needed.







            share|improve this answer














            share|improve this answer



            share|improve this answer








            edited Mar 26 at 10:11

























            answered Mar 25 at 12:45









            Rajesh SRajesh S

            4,4202724




            4,4202724








            • 3





              This is over complicating things and doesn't answer the question (how many days). The OP is not asking number of years or years, months and days.

              – Chris Rogers
              Mar 25 at 12:55











            • @ChrisRogers,, Read my post I've suggested all possible Formula, including the OP's one, regarding ((B1-A1)+1)/365.25. It's really unfortunate to get DOWN VOTE after All !!

              – Rajesh S
              Mar 25 at 12:58













            • @ChrisRogers,, this is part of OP,,But often I seen when people are calculating the number of days between 2 dates or age they use the formula B1-A1

              – Rajesh S
              Mar 25 at 13:02











            • @ChrisRogers,, considering the Formula OP has written and I've shown in comments ,, my solution has Focused on ALL that and the Suggested one is an improvise version I've shown with my Answer !! =INT((B1-A1)/365)

              – Rajesh S
              Mar 25 at 13:05








            • 3





              INT((B1-A1)/365) can provide the wrong result if there is are leap years involved.

              – Chris Rogers
              Mar 25 at 13:21














            • 3





              This is over complicating things and doesn't answer the question (how many days). The OP is not asking number of years or years, months and days.

              – Chris Rogers
              Mar 25 at 12:55











            • @ChrisRogers,, Read my post I've suggested all possible Formula, including the OP's one, regarding ((B1-A1)+1)/365.25. It's really unfortunate to get DOWN VOTE after All !!

              – Rajesh S
              Mar 25 at 12:58













            • @ChrisRogers,, this is part of OP,,But often I seen when people are calculating the number of days between 2 dates or age they use the formula B1-A1

              – Rajesh S
              Mar 25 at 13:02











            • @ChrisRogers,, considering the Formula OP has written and I've shown in comments ,, my solution has Focused on ALL that and the Suggested one is an improvise version I've shown with my Answer !! =INT((B1-A1)/365)

              – Rajesh S
              Mar 25 at 13:05








            • 3





              INT((B1-A1)/365) can provide the wrong result if there is are leap years involved.

              – Chris Rogers
              Mar 25 at 13:21








            3




            3





            This is over complicating things and doesn't answer the question (how many days). The OP is not asking number of years or years, months and days.

            – Chris Rogers
            Mar 25 at 12:55





            This is over complicating things and doesn't answer the question (how many days). The OP is not asking number of years or years, months and days.

            – Chris Rogers
            Mar 25 at 12:55













            @ChrisRogers,, Read my post I've suggested all possible Formula, including the OP's one, regarding ((B1-A1)+1)/365.25. It's really unfortunate to get DOWN VOTE after All !!

            – Rajesh S
            Mar 25 at 12:58







            @ChrisRogers,, Read my post I've suggested all possible Formula, including the OP's one, regarding ((B1-A1)+1)/365.25. It's really unfortunate to get DOWN VOTE after All !!

            – Rajesh S
            Mar 25 at 12:58















            @ChrisRogers,, this is part of OP,,But often I seen when people are calculating the number of days between 2 dates or age they use the formula B1-A1

            – Rajesh S
            Mar 25 at 13:02





            @ChrisRogers,, this is part of OP,,But often I seen when people are calculating the number of days between 2 dates or age they use the formula B1-A1

            – Rajesh S
            Mar 25 at 13:02













            @ChrisRogers,, considering the Formula OP has written and I've shown in comments ,, my solution has Focused on ALL that and the Suggested one is an improvise version I've shown with my Answer !! =INT((B1-A1)/365)

            – Rajesh S
            Mar 25 at 13:05







            @ChrisRogers,, considering the Formula OP has written and I've shown in comments ,, my solution has Focused on ALL that and the Suggested one is an improvise version I've shown with my Answer !! =INT((B1-A1)/365)

            – Rajesh S
            Mar 25 at 13:05






            3




            3





            INT((B1-A1)/365) can provide the wrong result if there is are leap years involved.

            – Chris Rogers
            Mar 25 at 13:21





            INT((B1-A1)/365) can provide the wrong result if there is are leap years involved.

            – Chris Rogers
            Mar 25 at 13:21


















            draft saved

            draft discarded




















































            Thanks for contributing an answer to Super User!


            • Please be sure to answer the question. Provide details and share your research!

            But avoid



            • Asking for help, clarification, or responding to other answers.

            • Making statements based on opinion; back them up with references or personal experience.


            To learn more, see our tips on writing great answers.




            draft saved


            draft discarded














            StackExchange.ready(
            function () {
            StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fsuperuser.com%2fquestions%2f1417263%2fcalculating-the-number-of-days-between-two-dates-in-excel%23new-answer', 'question_page');
            }
            );

            Post as a guest















            Required, but never shown





















































            Required, but never shown














            Required, but never shown












            Required, but never shown







            Required, but never shown

































            Required, but never shown














            Required, but never shown












            Required, but never shown







            Required, but never shown







            Popular posts from this blog

            Biblatex bibliography style without URLs when DOI exists (in Overleaf with Zotero bibliography)

            ComboBox Display Member on multiple fields

            Is it possible to collect Nectar points via Trainline?