Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now










share|improve this question









New contributor




Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.




















  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 at 13:47










  • I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    2 days ago















up vote
2
down vote

favorite












Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now










share|improve this question









New contributor




Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.




















  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 at 13:47










  • I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    2 days ago













up vote
2
down vote

favorite









up vote
2
down vote

favorite











Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now










share|improve this question









New contributor




Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.











Is the scrum meeting started by the person whom comes to the meeting last



or



Anybody chosen by the team starts the scrum meeting?



Tried to find answer to this question but no luck till now







scrum agile daily-scrum scrum-ceremonies






share|improve this question









New contributor




Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.











share|improve this question









New contributor




Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.









share|improve this question




share|improve this question








edited 2 days ago









Tiago Cardoso

4,53311651




4,53311651






New contributor




Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.









asked Nov 12 at 13:19









Sujatha Kannan

111




111




New contributor




Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.





New contributor





Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.






Sujatha Kannan is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
Check out our Code of Conduct.












  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 at 13:47










  • I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    2 days ago


















  • Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
    – Sujatha Kannan
    Nov 12 at 13:47










  • I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
    – Tiago Cardoso
    2 days ago
















Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
– Sujatha Kannan
Nov 12 at 13:47




Scrum master is not mandatory to attend though he/she ensures that meeting happens. So I feel scrum master pointing someone to start the meeting will not be best answer. But I am not sure. Just a guess.
– Sujatha Kannan
Nov 12 at 13:47












I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
– Tiago Cardoso
2 days ago




I believe Scrum framework does not define who should start the meeting exactly to give the freedom to each team to find the best approach for each case. With that said, will be very hard to find a canonical answer for this question.
– Tiago Cardoso
2 days ago










5 Answers
5






active

oldest

votes

















up vote
3
down vote













The team should decide. The meeting belongs to the team.



If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






share|improve this answer




























    up vote
    1
    down vote













    As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



    If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






    share|improve this answer




























      up vote
      0
      down vote













      The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




      1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

      2. If your team use token as sign, who own token will start first.

      3. Or Scrum master decide who will start (No recomend).


      Please share your ideas, I think we have no answer for the type of question, just best practice.






      share|improve this answer








      New contributor




      PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
      Check out our Code of Conduct.

























        up vote
        0
        down vote













        Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






        share|improve this answer








        New contributor




        Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
        Check out our Code of Conduct.

























          up vote
          0
          down vote













          nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




          • Everyone should start at least once every certain time

          • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

          • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

          • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

          • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






          share|improve this answer





















            Your Answer








            StackExchange.ready(function() {
            var channelOptions = {
            tags: "".split(" "),
            id: "208"
            };
            initTagRenderer("".split(" "), "".split(" "), channelOptions);

            StackExchange.using("externalEditor", function() {
            // Have to fire editor after snippets, if snippets enabled
            if (StackExchange.settings.snippets.snippetsEnabled) {
            StackExchange.using("snippets", function() {
            createEditor();
            });
            }
            else {
            createEditor();
            }
            });

            function createEditor() {
            StackExchange.prepareEditor({
            heartbeatType: 'answer',
            convertImagesToLinks: false,
            noModals: true,
            showLowRepImageUploadWarning: true,
            reputationToPostImages: null,
            bindNavPrevention: true,
            postfix: "",
            imageUploader: {
            brandingHtml: "Powered by u003ca class="icon-imgur-white" href="https://imgur.com/"u003eu003c/au003e",
            contentPolicyHtml: "User contributions licensed under u003ca href="https://creativecommons.org/licenses/by-sa/3.0/"u003ecc by-sa 3.0 with attribution requiredu003c/au003e u003ca href="https://stackoverflow.com/legal/content-policy"u003e(content policy)u003c/au003e",
            allowUrls: true
            },
            noCode: true, onDemand: true,
            discardSelector: ".discard-answer"
            ,immediatelyShowMarkdownHelp:true
            });


            }
            });






            Sujatha Kannan is a new contributor. Be nice, and check out our Code of Conduct.










             

            draft saved


            draft discarded


















            StackExchange.ready(
            function () {
            StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fpm.stackexchange.com%2fquestions%2f25211%2fwho-starts-the-daily-scrum-meeting%23new-answer', 'question_page');
            }
            );

            Post as a guest
































            5 Answers
            5






            active

            oldest

            votes








            5 Answers
            5






            active

            oldest

            votes









            active

            oldest

            votes






            active

            oldest

            votes








            up vote
            3
            down vote













            The team should decide. The meeting belongs to the team.



            If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






            share|improve this answer

























              up vote
              3
              down vote













              The team should decide. The meeting belongs to the team.



              If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






              share|improve this answer























                up vote
                3
                down vote










                up vote
                3
                down vote









                The team should decide. The meeting belongs to the team.



                If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.






                share|improve this answer












                The team should decide. The meeting belongs to the team.



                If the issue of starting off is a persistent problem during the sprint, then the SM should bring it up during the retro and facilitate the discussion to come to an agreement.







                share|improve this answer












                share|improve this answer



                share|improve this answer










                answered 2 days ago









                Vicki Laidler

                2,091615




                2,091615






















                    up vote
                    1
                    down vote













                    As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                    If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






                    share|improve this answer

























                      up vote
                      1
                      down vote













                      As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                      If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






                      share|improve this answer























                        up vote
                        1
                        down vote










                        up vote
                        1
                        down vote









                        As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                        If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.






                        share|improve this answer












                        As there is no special meaning to who goes first and who goes after, team members should volunteer. If multiple team members volunteer it should take seconds to sort it out because it does not really matter.



                        If nobody volunteers you need to speak with your team about their commitment to this project and team. It is in their own self interest that someone starts the meeting on time.







                        share|improve this answer












                        share|improve this answer



                        share|improve this answer










                        answered 2 days ago









                        nvoigt

                        2,999715




                        2,999715






















                            up vote
                            0
                            down vote













                            The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                            1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                            2. If your team use token as sign, who own token will start first.

                            3. Or Scrum master decide who will start (No recomend).


                            Please share your ideas, I think we have no answer for the type of question, just best practice.






                            share|improve this answer








                            New contributor




                            PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                            Check out our Code of Conduct.






















                              up vote
                              0
                              down vote













                              The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                              1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                              2. If your team use token as sign, who own token will start first.

                              3. Or Scrum master decide who will start (No recomend).


                              Please share your ideas, I think we have no answer for the type of question, just best practice.






                              share|improve this answer








                              New contributor




                              PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                              Check out our Code of Conduct.




















                                up vote
                                0
                                down vote










                                up vote
                                0
                                down vote









                                The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                                1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                                2. If your team use token as sign, who own token will start first.

                                3. Or Scrum master decide who will start (No recomend).


                                Please share your ideas, I think we have no answer for the type of question, just best practice.






                                share|improve this answer








                                New contributor




                                PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                Check out our Code of Conduct.









                                The quesion looks the same with PSMI exam, one of my colleagues showed to me last month and got consultant from me. Some ideas for you, the practice base on my experience, you should consider the team's maturity to choose a appropriate way:




                                1. If you want to encourage your team member join the daily meeting on time, the meeting could start by person whom comes to the meeting last.

                                2. If your team use token as sign, who own token will start first.

                                3. Or Scrum master decide who will start (No recomend).


                                Please share your ideas, I think we have no answer for the type of question, just best practice.







                                share|improve this answer








                                New contributor




                                PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                Check out our Code of Conduct.









                                share|improve this answer



                                share|improve this answer






                                New contributor




                                PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                Check out our Code of Conduct.









                                answered Nov 12 at 13:32









                                PeaceInMind

                                1034




                                1034




                                New contributor




                                PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                Check out our Code of Conduct.





                                New contributor





                                PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                Check out our Code of Conduct.






                                PeaceInMind is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                Check out our Code of Conduct.






















                                    up vote
                                    0
                                    down vote













                                    Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






                                    share|improve this answer








                                    New contributor




                                    Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                    Check out our Code of Conduct.






















                                      up vote
                                      0
                                      down vote













                                      Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






                                      share|improve this answer








                                      New contributor




                                      Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                      Check out our Code of Conduct.




















                                        up vote
                                        0
                                        down vote










                                        up vote
                                        0
                                        down vote









                                        Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.






                                        share|improve this answer








                                        New contributor




                                        Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                        Check out our Code of Conduct.









                                        Once everyone arrives – and they should be reminded to always show up on time – "just flip a coin, or roll a couple of dice." Or, if someone feels that they have a point that needs to be brought up early and wants to go first, let them.







                                        share|improve this answer








                                        New contributor




                                        Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                        Check out our Code of Conduct.









                                        share|improve this answer



                                        share|improve this answer






                                        New contributor




                                        Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                        Check out our Code of Conduct.









                                        answered 2 days ago









                                        Mike Robinson

                                        1853




                                        1853




                                        New contributor




                                        Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                        Check out our Code of Conduct.





                                        New contributor





                                        Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                        Check out our Code of Conduct.






                                        Mike Robinson is a new contributor to this site. Take care in asking for clarification, commenting, and answering.
                                        Check out our Code of Conduct.






















                                            up vote
                                            0
                                            down vote













                                            nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                            • Everyone should start at least once every certain time

                                            • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                            • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                            • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                            • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






                                            share|improve this answer

























                                              up vote
                                              0
                                              down vote













                                              nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                              • Everyone should start at least once every certain time

                                              • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                              • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                              • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                              • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






                                              share|improve this answer























                                                up vote
                                                0
                                                down vote










                                                up vote
                                                0
                                                down vote









                                                nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                                • Everyone should start at least once every certain time

                                                • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                                • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                                • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                                • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts






                                                share|improve this answer












                                                nvoigt, I think there can be a meaning to whom starts first or make the daily scrum more effective depending on the state of the project. Some advise I can give to decide on a methodology goes as follows:




                                                • Everyone should start at least once every certain time

                                                • The order should be beneficial for the current state of the project (for example, it might make sense to naturally allow individuals working on close tasks to report one after the other to understand the big picture)

                                                • When working on a “Crysis” or very “important” issues, it might be wise to allow those individuals to go first, so that the following individuals know if there’s any change they have to make to their activities during the day, this also allows the team to focus on getting done what is crucial at this point in time

                                                • Important to the previous point: everyone should take important / critical tasks once in a while depending on circumstances

                                                • I agree that the team should feel safe about being the first to do the daily scrum, so perhaps when whom starts is not important, you can try a random way to select who starts







                                                share|improve this answer












                                                share|improve this answer



                                                share|improve this answer










                                                answered 2 days ago









                                                Roberto Anzaldua

                                                863112




                                                863112






















                                                    Sujatha Kannan is a new contributor. Be nice, and check out our Code of Conduct.










                                                     

                                                    draft saved


                                                    draft discarded


















                                                    Sujatha Kannan is a new contributor. Be nice, and check out our Code of Conduct.













                                                    Sujatha Kannan is a new contributor. Be nice, and check out our Code of Conduct.












                                                    Sujatha Kannan is a new contributor. Be nice, and check out our Code of Conduct.















                                                     


                                                    draft saved


                                                    draft discarded














                                                    StackExchange.ready(
                                                    function () {
                                                    StackExchange.openid.initPostLogin('.new-post-login', 'https%3a%2f%2fpm.stackexchange.com%2fquestions%2f25211%2fwho-starts-the-daily-scrum-meeting%23new-answer', 'question_page');
                                                    }
                                                    );

                                                    Post as a guest




















































































                                                    Popular posts from this blog

                                                    Biblatex bibliography style without URLs when DOI exists (in Overleaf with Zotero bibliography)

                                                    ComboBox Display Member on multiple fields

                                                    Is it possible to collect Nectar points via Trainline?